Faroe Islands FRA Shack Renovation

7juli10_2I4B5026

In an email tonight from OY1OF Ólavur Frederiksen explains that the air waves over the Faroe Islands have been quieter than normal this summer due to the shack renovation of the FRA HQ. Floors, ceilings and roof have all been replaced. Thanks to Ólavur for the following photographic images of the work being done. It is great to hear the Islanders “On Air” from the new refurbished shack. You can view more of Ólavur’s gallery here.
 
28aug10_2I4B9160

2I4B883716juni10_2V6G1892

28aug10_7juli10_2I4B5092

28aug10_2I4B9263

About author View all posts

Tim Beaumont